Prime Dome Construction
Jump to navigation
Jump to search
Length Table
A Yellow 3.958 47.496 B Blue 4.638 55.656 C Red 4.429 53.148 D Black 4.938 59.256 E Green 4.562 54.744 F Orange 4.821 57.852 G Silver 5.013 60.156 H Pink 5.243 62.916 I Brown 5.274 63.288
Side 26.916 29.916 Height 23.30993977 26.30993977
Labor
A small crew is normally dedicated to this task. It normally takes about 2 days.
Safety
This may not be a complete list.
- Ask questions, see something say something.
- We have deburred conduit, but there may still be sharp things.
- Team lift, communication and coordination of the team is important.
- safety glasses are required.
- rough housing is not allowed.
- hearing protection is required. Impact drivers are very loud.
- Do not put yourself under a part of the dome that is propped up.
- Take frequent breaks.
- You may want to wear gloves.
- Drink penty of water.
- Wear sunscreen.
- Have a big brimmed hat.